Thursday, 20 February 2020 - 4:01pm
Water Distribution
Mister Speaker, the pump at the Long Trench station has been installed. The operationalization of this pump is dependent on an adequate power supply which necessitates a 480kw transformer which is now being installed by BVI Electricity Cooperation. This is expected to provide a consistent supply of water to the residents of Sea Cows Bay and surrounding areas.